盾构隧道管片衬砌内力计算方法对比分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Comparison and analysis of methods of internal force calculations for shield tunnel lining
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    论述了盾构隧道管片衬砌内力计算的梁-弹簧法和弹性匀质圆环法。结合一工程实例,采用此两种方法对管片衬砌内力进行了计算,并对计算的结果进行了对比分析。结果表明,采用梁-弹簧法进行设计是安全的、经济的,值得推广应用。

    Abstract:

    The elastic-inhomogeneous-ring method and beam-spring methods of internal forces calculations for the shield tunnel lining are discussed in detail.As a traditional method of shield tunnel lining designing,the elastic-inhomogeneous-ring is safe but conservative.Combining with a practical engineering example,its internal forces were calculated respectively by the two methods.The results of these two methods were compared and analyzed,and drew the conclusion that the beam-spring method for the designing of the shield tunnel lining is safe and economical.

    参考文献
    相似文献
    引证文献
引用本文

刘琼,吴雄志,姚捷,袁洪升.盾构隧道管片衬砌内力计算方法对比分析[J].河北工程大学自然版,2008,25(3):26-29

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-05-08
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-01-12
  • 出版日期:
文章二维码