矿井主扇不停风切换控制方案研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


A study on the main ventilator switching control scheme without off- blast for mines
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    瓦斯积聚和瓦斯超限是矿井安全生产的重大隐患,而矿井风井不定期的风机检修倒机和故障倒机则承受着避免瓦斯积聚和瓦斯超限等安全标准的巨大挑战。本文独创性地提出了通风机热备用的思路,变传统方式下的"系统停风"为短暂的"风量波动",可以保证在主通风机倒机期间通风动力的持续供应,通过流体力学论证了该方案的科学性,并对该方案的自动控制实现、电源要求、现有煤矿条件进行了分析,认为该方案具备普遍性的实施基础,对矿井安全生产有着巨大的意义。

    Abstract:

    Methane accumulation and gas overrun accident bring heavy hidden danger to the production safety in coalmines, irregularly maintenance and switch of fan and switch fault face great challenge from safety standard such as methane accumulation and gas overrunning. This paper proposed standby fan originally, guaranteed continuity of power supply during main fan switching, It demonstrate the scientific of the scheme based on fluid mechanics, meanwhile, analyze automatic control, power requirements and coal conditions. At last, it is concluded that the scheme offer the universal implemental foundation and has huge significance to the mine safety production.

    参考文献
    相似文献
    引证文献
引用本文

王韬,白宏峰,王克智,荀洪菲.矿井主扇不停风切换控制方案研究[J].河北工程大学自然版,2011,28(4):78-80

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-10-17
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-01-12
  • 出版日期:
文章二维码