    摘要:

    双连拱隧道施工工艺作为隧道施工中的一项工艺在不断改进。本文通过施工九瑞高速桂林二双连拱隧道,对较长连拱隧道施工功效进行了总结,解决了土石夹杂地质冒顶、伪顶问题等,分析了锚杆受力原理,并在传统的施工工艺上进一步优化改进;本次施工对双连拱隧道施工工艺方法进一步优化改进,并完成了整套工艺的开发,可为以后的同类工程施工提供参考。

    Abstract:

    Along with our country highway's development double arch tunnel construction technology for tunnel construction improve continously at high speed in the construction; taking two double archtunnel in Guilin for example, the author summarized longer connecting arch tunnel construction effec, the problems including the Earth Inclusion geology roof roof problems,analysis of anchor force principle were solved,and the traditional construction technology was also optimized; the construction of the double arch tunnel construction technology for further optimization and improvement had completed the whole set process development it could provide the reference for the later similar project construction.

    参考文献
    相似文献
    引证文献
引用本文

冯海暴.土石夹杂连拱隧道施工技术[J].河北工程大学自然版,2012,29(1):44-47

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-10-29
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-01-12
  • 出版日期:
文章二维码