吉克煤矿首采区上行开采可行性分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Feasibility analysis on upward mining in first mining area of Jike coal mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过理论计算和数值模拟方法,对吉克煤矿首采区M11煤层上行开采的可行性进行了研究。结果表明,计算得出M11煤层开采后覆岩最大垮落带高度为8.47 m,导水裂隙带高度为21.1 m-32.4 m,M9煤层位于导水裂隙带之内。数值模拟结果表明,M9煤层内部的垂直应力显著下降,垮落带和导水裂隙带高度分别为10 m和36 m,M11煤层开采对M9煤层的卸压效果明显。首采区利用M11煤层作为M9煤层的解放层是可行的。

    Abstract:

    Based on method of theory analysis and numerical simulation, feasibility analysis on upward mining on N0. Ml l coal seam in the first mining area of Jike colliery in Yunnan province was stud- ied. The results showed that the height of caving zone after mining is 8. 47 meters, and height of frac- tore zone is 21. 132. 4 meters, the M9 coal seam is in the fracture zone of M11 coal seam after min- ing. Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously re- doted. The maximum height of fracture zone is 26 meters. And the relief effect is significant. It is feasible to make Ml l coal seam as the operation layer for M9 coal seam.

    参考文献
    相似文献
    引证文献
引用本文

李恩全,付永洁,孟辉,张思华.吉克煤矿首采区上行开采可行性分析[J].河北工程大学自然版,2012,29(2):61-64