    摘要:

    目前船闸大修周期的确定基本依靠经验, 难以满足运行安全性和维修经济性的双重要求。本文将风险分析技术引入到船闸的大修周期决策中, 实现船闸大修周期决策的科学化。通过风险辨识技术得到船闸运行的关键部件, 结合船闸大修工程的特点, 对关键部件失效的概率及相应损失进行建模量化, 最后依据船闸运行效益费用比最小的原则建立大修周期决策模型并进行模型实例计算, 研究成果可作为船闸大修周期决策的理论依据。

    Abstract:

    As the determination for the cycle of the overhaul depends on experience now, the determi-nation cant meet the safety and economical requirements.Risk analysis technology was used in thedecision making in order to realize the scientific decision.The risk identification technology was usedto find the key parts of operation.Combining with the characteristics of the overhaul, the model ofprobability of failure and the loss cost were proposed.In the end, the decision-making model depen-ding onagementthe least CER was established.The results can be used as the theoretical basis for the man-of cycle decision.

    参考文献
    相似文献
    引证文献
引用本文

马丽佳.基于风险分析的船闸大修周期确定方法[J].河北工程大学自然版,2012,29(3):77-80

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-05-10
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-01-12
  • 出版日期:
文章二维码