    摘要:

    本文首先论述了梧桐庄矿矿井水回灌的必要性和回灌工程的意义,介绍了地下水回灌的技术方法,然后论证该矿回灌所具备的水文地质条件。在此基础上,进行了将矿井水回灌于奥灰含水层的技术研究,确定了连续回灌与定时回扬回灌试验工程方案,以回灌水位降幅削减值和水量降幅削减值作为回灌效果的评价标准,回灌前后水位降幅削减值3.36 m,量水位降幅削减值0.224×10-3m/m3。最后从回灌后水文地质条件、回灌处理水质对含水层的影响和回灌工程方案三个方面进行了矿井水回灌的可行性评价。

    Abstract:

    The necessity of mine water for recharging and the significance of recharge engineering a—bout Wu tongzhuang Coal Mine were discussed at the beginning of this paper, the technology and method of groundwater recharge were introduced, and then, the hydrogeology conditions of recharge in this mine were discussed.On the basis of above all.the technology study of mine water is re. charged to the aquifer in Ordovician limestone was carried out, the program of experimental engineer—ing about continuous recharge and timing recharge about redelivery were firmed.The reduction values of decreasing range about recharge water level and quantity are as evaluation standard on the effect of recharge, the reduction value of water level is 3.36 mm and the reduction value of water quantity is 0.224×10-3m/m3 before and after recharging.The feasibility of mine water recharge was evaluated from the hydrogeology conditions after recharging, the affect of aquifer and water quality through dis—posing, and the program of recharge engineering at the end of paper.

    参考文献
    相似文献
    引证文献
引用本文

李世峰,高文婷,牛永强,王屹.矿井废水回灌工程试验研究[J].河北工程大学自然版,2012,29(4):66-70