万浩俪城S1工程深基坑支护方案设计与分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


The scheme design and analysis about the deep foundation pit support of Wan Hao Li Cheng Sengineering
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    万浩俪城S1工程东北边缘毗邻国家电网河东110kV变电站,考虑到基坑周围环境的复杂性与支护工程的安全经济性,采取分段计算分析的方法,运用理正深基坑软件进行支护方案设计的计算。

    Abstract:

    The northeast edge of Wan HaoSubstation of the State Grid,considering theLi Cheng S Engineering is adjacent to Hedong 110 kVcomplexity of surrounding environment and the safety andeconomic of the support engineering,the supporting scheme was computed by using the subsectionmethod and 1izheng deep foundation pit software.The edge of jsegment pit,which is 2.0 metersaway from the substation,is sensitive to soil deformation,the narrow space can not stepslope excavate,and soil nailing wall can not meet the security requirements of the lateral wall,thus,the pileanchor retaining structure is selected;the surroundings of B segment are roads and extensive spaces,the stepslope bility of the pile soil nailing wall supporting structure is adopted.The results show that,the global staanchor retaining segment like local and various parameters such as antioverturning and resistant heave;and the parameterstensile and internal and external stability of the stepslope soil nailing wall supporting segment all meet the requirements of specifications,the whole designschemes is feasible.reasonable andeconomic.

    参考文献
    相似文献
    引证文献
引用本文

张立钊,关英斌,张巍,李利飞,许道军.万浩俪城S1工程深基坑支护方案设计与分析[J].河北工程大学自然版,2013,30(1):69-73

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-07-17
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-01-12
  • 出版日期:
文章二维码