Due to the great mount of sluice gates with the middle route of the South to North Water Diversion Project,it's hard to avoid operation on and off of sluice gates.This paper use the SWMM model to simulate varies conditions water parameters,including the changing rule of depth of water after the sluice gate under different operation conditions.The results show that faster of gates speed and the opening height is,greater the water level wave changes