    摘要:

    采用有限元分析软件MIDAS/GEN 对某大跨度钢网架厂房的施工过程建立有限元模型进行跟踪模拟分析, 得出结构体系在各工况下构件的内力及变形。结果表明, 构件的最大内力及变形均出现在提升过程的第一工况下。其结果对施工方案的实施具有一定的参考价值。

    Abstract:

    The finite element model of the construction process of a large-span steel truss factory is established by using finite element analysis software MIDAS/GEN. The track simulation analysis was carried out during the construction process. The internal force and deformation of components of structural system under various operating conditions were obtained. The results show that the maximum internal force and deformation of components appear in the first working conditions in the process of ascension. The analysis results have some reference value for the implementation of the construction plan.

    参考文献
    相似文献
    引证文献
引用本文

谭燕秋,霍立超,王朋飞.大跨度钢网架结构整体提升施工阶段模拟分析[J].河北工程大学自然版,2015,32(1):5-7,26

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2014-10-20
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-06-04
  • 出版日期:
文章二维码