Abstract:Combined with the characteristic of projects,this paper establishes evaluation index system with five first class indicators such as green construction management,environmental pollution,relative technology and fifteen second class indicators.This paper proposes the evaluation method based on AHP-MF.AHP is used to calculate the weight of each indicator.MF is used to evaluate the results.The method is applied to a project,and the results show that it is feasible.