Extension evaluation of the risk in the earlier stage of real estate project and case study
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Real estate project is characterized by long life cycle, huge investment,many participants and complex relationships,so there are lots of undefined risk factors in the performing process.These characteristics determine that the investors will inevitably face many risks in every stage of the whole processes especially in the earlier stage.Therefore taking earlier stage of real estate project as example,this thesis introduces extension engineering method into risk evaluation,and builds risk extension evaluation model.At the end the thesis takes Yishang international project in Handan city as a case to analyze.The results verify that the method is effective to make rapid and rational decision support for developer in earlier stage of real estate project.

    Reference
    Related
    Cited by
Get Citation

LIU Jun'e, ZHANG Xiao-bing. Extension evaluation of the risk in the earlier stage of real estate project and case study[J].,2009,26(1):98-102

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 18,2008
  • Revised:
  • Adopted:
  • Online: January 12,2015
  • Published:
Article QR Code