Simulation analysis of construction process of super high-rise hybrid structure building
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    As the super high-rise hybrid structure buildings are very complex and construction cycleis generally long,so that the different construction scheme and load sequence of actual construction load have a great impact on the internal forces and deformation of structure members during the construction process. Combined with the erection project of Central Bank of Kuwait New Headquarters Building(CBK),which is the super high-rise hybrid structure building, simulation analysis of actual construction process was studied by one finite element analysis software. By comparing the analysis result data of two different construction scheme,the different change tendency of member stress and deformation during all the construction process can be confirmed. And the more reasonable construction scheme is applied to ensure the construction safety through the construction process of complex super high-rise building.

    Reference
    Related
    Cited by
Get Citation

WU Tian-he, GAO Yuan, WEI Xiu-xia. Simulation analysis of construction process of super high-rise hybrid structure building[J].,2012,29(1):19-22

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 12,2011
  • Revised:
  • Adopted:
  • Online: January 12,2015
  • Published:
Article QR Code