Application of High Density Electrical Method in Exploration of Pipe Jacking in Early Stage
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Drilling exploration show that the construction area is complex. There are a lot of pebbles and other hard rock, which will have a great impact on the jacking of the pipe jacking. It is necessary to formulate a suitable and effective construction site for the pipe jacking construction and reduce the probability of stuck drilling. The high-density electrical method exploration equipment is used to carry out detailed surveys of the strata in the construction area. Firstly, the fault layer near the construction area is measured, which proves the reliability of high-density electric method technology in the exploration of stratum distribution and rock formation. Finally, The Wenner device and the Schlumberger device are used to survey the proposed construction area and good results are achieved. Initially, a grounding depth trend with less obstacles is proposed for the pipe jacking construction.

    Reference
    Related
    Cited by
Get Citation

ZHANG Yenan, WANG Xiaofan, HU Baowen, SU Hui, LIU Zhongliang, MA Jianguo, DONG Zhijie, ZHANG Lifeng. Application of High Density Electrical Method in Exploration of Pipe Jacking in Early Stage[J].,2019,36(1):46-50

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 19,2019
  • Revised:
  • Adopted:
  • Online: April 24,2019
  • Published:
Article QR Code